Well, two days really. In two days we got the entire building wired, and 50% insulated.
That may not sound like a big deal, but there are about 40 outlets, several 3-way switches, 8 overhead lights, 2 overhead outlets, 3 floor outlets, and 2 outdoor GFI outlets.
We used about 600 feet of 14-2 wire, 150′ of 14-3 wire and 100′ of 12-3.
The insulation went well, as well as anything involving insulation ever goes, that is. Oddly enough the R-30 batts in the ceiling were actually the easiest. The guys have a really great scaffold and a pair of 4-foot wide ladders with an extending aluminum deck to span between them.
I’m definitely going to get pictures tomorrow. I started my day at Home Depot around 7:30am and came in for dinner at 9pm. Easy to see how a minor detail like pictures can get missed.
Tomorrow the drywall and wall covering goes on.